Handyman Pricing

Job pricing guide

How to price a TV mounting job

Account for wall type, television size, bracket assembly, cable routing, and the risk of concealed utilities.

How should you price this job?

Confirm the television, mount, wall construction, lifting plan, and cable scope before setting the price. Estimate the time for layout, bracket assembly, fastening, lifting, leveling, and cleanup, including every worker required. Add job materials, travel, overhead, access costs, uncertainty, and your target margin using your own business numbers.

What affects the price?

  • TV size and mount style
  • Stud, masonry, or specialty wall
  • Cable concealment and outlet location

Pricing considerations

  • Count two-person time whenever the television or access makes a helper necessary for a safe lift.
  • Allow for the correct fastening method, tools, and drilling time when mounting to masonry or another specialty wall.
  • Treat soundbars, surface cable covers, in-wall concealment, and new electrical work as distinct scope items rather than assuming they are included.

What costs should you include?

Count every hour the job occupies—including paid travel—then add raw materials, vehicle cost, allocated overhead, and job-specific expenses. Add visible pricing adjustments and a risk reserve before using margin math to find the selling price. The pricing methodology explains each allocation and the difference between markup and margin.

Pricing workflow

  1. Confirm the TV size, weight, VESA pattern, bracket type, and who supplies the mount.
  2. Identify studs or masonry and inspect the cable and outlet plan.
  3. Decide whether safe lifting requires a second worker and whether soundbar or concealment work is included.

Scope checklist

  • Include mount assembly, layout, fastening, leveling, TV hanging, and basic cleanup.
  • State whether cable covers, soundbar mounting, device setup, and packaging disposal are included.
  • Exclude new electrical outlets and concealed-wall repair unless separately approved and permitted.

Common scope variables

  • Mount supplied or purchased
  • Fixed, tilt, or full-motion bracket
  • Soundbar or accessory installation
  • In-wall or surface cable management

Costs commonly forgotten

  • Specialty anchors or masonry bits
  • A second worker for safe lifting
  • Parking and high-rise access
Common pricing mistake

Quoting for one worker before checking TV weight, or pricing a masonry wall as if it were standard wood-stud drywall.

Flat rate or hourly?

A flat rate is practical after confirming the wall, mount, TV size, and cable scope. Use hourly or a change-order allowance when wall conditions are unknown.

In either case, calculate every planned allocation first. A flat rate should still pay for estimated working time, travel, overhead, risk, and target-margin surplus.

Worked pricing example

Example only — not market pricing.

These hypothetical assumptions run through the same pricing engine as the calculator:

Labor time
1.50 hours × 2 workers
Travel time
0.67 hours
Desired hourly compensation
$45.00 per worker-hour
Planned labor compensation
$195.30
Raw materials
$20.00
Material pricing adjustment
0% = $0.00
Overhead allocation
$800.00 ÷ 80 billable hours × 2.17 hours = $21.70
Vehicle and job expenses
$12.00
Difficulty adjustment
10% = $22.90
Contingency / risk reserve
5% = $13.60
Target margin
20%
Calculated minimum price
$356.88
Rounded suggested quote
$360.00

The rounded quote contains $74.50 of target-margin surplus after all listed allocations. Replace every assumption with your own job numbers.

Frequently asked questions

Should two-person lifting be priced in?

Yes. Set the worker count to two for the time both people are required.

Is cable concealment included?

Treat it as a separate scope item because wall type and electrical limitations can change the work substantially.

Should mounting on masonry change the price?

Base any difference on the extra drilling time, suitable fasteners, tool wear, dust control, and uncertainty in that specific job—not on a generic surcharge.

Use your actual numbers

Calculate your tv mounting quote

Travel time is paid business time in this calculator. No local or national price averages are used.

1

Quick Quote

Enter the essentials for a fast, practical starting price.

Job type
Estimated labor time
Number of workers
What do you want to earn per working hour?

The same hourly goal is applied to each worker.

Materials

Materials and consumables you expect to use.

Round-trip driving time
Advanced pricing settingsThese settings affect your quote

Fine-tune material pricing, operating costs, difficulty, risk, and margin.

Material markup

An exact materials adjustment: $100 at 20% adds $20. It is not compounded by difficulty or contingency.

Mileage / vehicle cost (optional)

Fuel, mileage allowance, tolls, or other trip cost.

Job-specific expenses

Disposal, parking, rentals, permits, helper, or miscellaneous supplies.

Monthly overhead

Insurance, phone, advertising, vehicle, tools, software, and licensing.

Expected billable hours per month

Required when monthly overhead is above $0.

Difficulty
Editable difficulty adjustments

Pricing adjustments—not market statistics.

Contingency / risk buffer

Covers small overruns, unexpected difficulty, and unplanned time.

Target profit margin

Margin is profit ÷ selling price. Markup is added to cost; markup ≠ margin.

Your quote is based on your own costs, time, overhead, and profit target. Local market benchmarks are not included.

Related pricing guides